Groundwater Remediation System Optimization

Groundwater Remediation System Optimization

Delta Technical Operation Center (TOC) Hartsfield-Jackson Atlanta International Airport, Remediation System Pilot Testing, Modeling and Optimization

Performed oversight of remediation system operation, maintenance, and monitoring (OMM) of the groundwater treatment system. Conducted a pilot test and prepared a model to optimize capture of a dissolved phase hydrocarbon and solvent release site. Prepared Remediation Work Plan, Pilot Testing and Modeling Report and Remedial Action Plan to modify existing system and optimize contaminant capture.